Run make test from the project root. It creates and destroys its own database; do not load these examples into an operational database.
Every plaa and ingest table receives a fictional example, with audit active. Generated IDs are deterministic only in this fresh, empty fixture database. Applications must use returned IDs rather than assume these values.
- A manually maintained region and asset support eight synthetic members and verified temporal Directory identities. A reviewed legacy crosswalk remains restricted staging evidence, not a login mapping.
- Two categories and activities are enabled for one August round, with relational allocations and regions.
- A raw bot submission is processed through its source manifest, accepted by a text reviewer principal and credited 10 points using point-value version 1.
- The used schedule closes on 20 August, with an adjacent 20-point successor. A historical correction reverses the original 10 and posts 12, without editing the original value/event.
- Two explicitly synthetic-only kudos policies demonstrate receiver-only (+10) and paired (+20 / −20) effects. These examples choose no production economics.
- Confirmed IA amounts of 100 + 50 and IR of 25 are imported with immutable provenance. A separate source-backed opening adjustment is 5. Member 1's example balance is 60 IA + 25 IR + 5 unallocated = 90. The whole fixture ledger totals 180. These are confirmed example amounts, not a points-to-PLAA conversion formula.
- Team holdings revise 123.12345678 → 124.12345678 units. Separately supplied Trust value/NAV revisions retain both originals. Quantity never generates a valuation.
- A bid for 3 Rights at $2 preserves its source-reported $7, even though calculated notional is $6. Another bid has no source amount and remains NULL. Neither changes holdings.
- A pending export-contract record illustrates the required metadata. A backend-bound transaction demonstrates the member's RLS read.
Source payloads are fictional; example.invalid is not a real evidence link. Each write's source reference, manifest and audit evidence can be followed through the ERD.
This file supplies one readable row for each of the seven export candidates. They form a separate toy dataset, not aggregates of the operational fixture. Tests check their keys and PostgreSQL types/constraints in temporary copies; the real export tables remain empty.
A contributor count of eight does not authorize a release. Related cuts may reveal a suppressed cell by subtraction, and successive releases may isolate one participant. A missing/suppressed value is unavailable, not zero. Actual contract-specific suppression, rounding, cross-release tests and source/consumer approvals must precede any real output.