Milestones
List view
All detector subsystems simulated, digitised and reconstructed.
Due by December 31, 2027Reconstruction runs on Phlex with ACTS-based tracking (Trout).
Due by March 31, 2027A reviewed strawtube response model replaces the smearing; tracking efficiency and momentum resolution are compared with FairShip on the same input samples.
Due by March 31, 2027The hidden-sector spectrometer chain runs end to end on the real geometry: muon background and EventCalc HNL signal through aegir, strawtube digitisation in Shannon and ACTS tracking in Trout, with a CI job that runs the full chain. Gaussian strawtube smearing is acceptable.
Due by December 31, 2026