Skip to content

chore: onboard OCP v5.0 FBC components - #615

Closed
bot-securesign-pr-manager[bot] wants to merge 1 commit into
mainfrom
add-ocp-v5.0
Closed

bot-securesign-pr-manager[bot] wants to merge 1 commit into
mainfrom
add-ocp-v5.0

chore: onboard OCP v5.0 FBC components

026479f
Select commit
Loading
Failed to load commit list.
Red Hat Konflux / Red Hat Konflux / configuration-as-code-on-pull-request cancelled Sep 10, 2026 in 3m 40s

Failed

Red Hat Konflux/configuration-as-code-on-pull-request has failed.

Details


Task Statuses:

StatusDurationName
🟢 Succeeded 6 seconds

init

🟢 Succeeded 5 seconds

derive-product-version

🟢 Succeeded 13 seconds

clone-repository

🟢 Succeeded 8 seconds

generate-labels

🟢 Succeeded 18 seconds

prefetch-dependencies

🟢 Succeeded 2 minutes

build-container

🟢 Succeeded 12 seconds

build-image-index

🟢 Succeeded 11 seconds

apply-tags

🟢 Succeeded 17 seconds

deprecated-base-image-check

🟢 Succeeded 22 seconds

ecosystem-cert-preflight-checks

🟢 Succeeded 10 seconds

rpms-signature-scan

🔴 Failed 25 seconds

clamav-scan

🔴 Failed 13 seconds

roxctl-scan

🟢 Succeeded 12 seconds

build-source-image

🟢 Succeeded 8 seconds

push-dockerfile

🟢 Succeeded 11 seconds

sast-shell-check

🟢 Succeeded 18 seconds

sast-snyk-check

🟢 Succeeded 16 seconds

sast-unicode-check


Failure snippet:

task clamav-scan has the status "TaskRunCancelled":
TaskRun "configuration-as-code-on-pull-request-x2lxj-clamav-scan" was cancelled. TaskRun cancelled as the PipelineRun it belongs to has been cancelled.